Project Highlights

In 2018, Herold Engineering Limited was retained as the Prime Consultant for the detailed design and construction phases of a pedestrian connection underneath the Johnson Street Bridge.  This pathway connected people between the Janion Building and the Northern Junk properties and spanned a large underwater utility cable system. This challenging project included a Crime Prevention Through Environmental Design study, civil, marine industrial, electrical and landscape consultants.

Return to Projects

Share this

Search