Gibsons Landing Vehicle Ramp

Gibsons

Project: 30 Tonne Vehicle Ramp
Client: Gibsons Landing Harbour Authority
Completed April 2013

Herold Engineering provided structural engineering design and drafting services for the ramp and abutment, as well as design of mooring piles for the SCH dual float at the bottom of the ramp. Herold Engineering also provided in-shop reviews during fabrication of the ramp and on-site reviews of the piling, float and ramp installation.